All NewsConstruction/DevelopmentFeaturedVictorville News

Victorville’s Brentwood Neighborhood to Get Major Overhaul Near Brentwood Elementary

VICTORVILLE, Calif. (VVNG.com) — Big changes are coming to Victorville’s Brentwood neighborhood.

During its April 1, 2025 meeting, the Victorville City Council unanimously approved a $287,500 construction contract to launch the Brentwood Beautification Project, a major landscape overhaul aimed at revitalizing the area near Brentwood Elementary School and Brentwood Park.

Contractor’s Connect, a Victorville-based company, was awarded the project following a competitive bid process. Six bids were received, and Contractor’s Connect was selected based on both its pricing and demonstrated ability, capacity, and skills.

Funded through a $149,528 Community Development Block Grant (CDBG) and $150,000 from the Landscape Maintenance Assessment District No. 3 (LMAD 3) funds, the project will replace outdated landscaping with drought-tolerant plants, retrofit irrigation systems, and add walkways, benches, and decorative elements. City staff designed the project in-house.

Conceptual landscape design for Brentwood Beautification Project in Victorville, showing drought-tolerant plants, seating areas, and decorative pathways near Brentwood Elementary.
Conceptual landscape design for the Brentwood Beautification Project, featuring drought-tolerant landscaping, decorative boulders, seating areas, and decomposed granite walkways.

The landscaping will feature drought-tolerant plants such as purple trailing lantana, Queen Victoria agave, blue palo verde trees, and deer grass.

Natural elements like decomposed granite in Saddleback Brown and California Gold, large quartz boulders, and stamped concrete seating areas are included in the design.

The project also includes curved concrete benches and dog waste stations to create a more welcoming and accessible space for families. A shade structure is envisioned for future installation but is not part of this construction phase.

A detailed map of the Brentwood neighborhood in Victorville, California, showing key locations such as Brentwood Park and the Brentwood School of Environmental Studies, along with labeled streets like Showhorse Lane, Aloe Road, Skipper Lane, and Hook Boulevard.
Map showing the location of the Brentwood Beautification Project in Victorville, California, highlighting nearby landmarks such as Brentwood Park and the Brentwood Elementary School.

Nearly a decade ago, the area across from Brentwood Elementary once featured lush green grass and vibrant landscaping.

Over time, however, the lack of a built-in cost escalator for LMAD 3’s maintenance assessment fee — fixed at $69.38 annually — prevented the district from keeping up with rising costs for labor, materials, and water, leading to deteriorating conditions.

Today, the space is mostly dry dirt with struggling trees and little visible landscaping remaining.

Council Members praised the project’s long-awaited approval. Council Member Debra Jones shared her support, stating:

“I’m so glad to see this has come before us. I think it’s long overdue, and I certainly appreciate the plight, as it were, of this particular area. District 2 certainly feels this, as we don’t have a built-in escalator also, although we all bought into a community that we thought was a great community, not realizing that over time it would be to our detriment because there wasn’t a built-in escalator. So I’m happy to see this for Brentwood, it’s overdue, and I’m happy to support it.”

Council Member Leslie Irving and Mayor Pro Tem Bob Harriman also voiced their support, both expressing appreciation that the contract was awarded to a Victorville-based contractor.

About LMAD 3

Landscape Maintenance Assessment District No. 3 (LMAD 3) covers landscaping, irrigation systems, lighting, monuments, walls, and other public improvements within the Brentwood Specific Plan area. The district boundaries are roughly Mojave Drive to the north, El Evado Road to the east, Amethyst Road to the west, and Seneca Road to the south.

Services funded through LMAD 3 include irrigation repairs, landscaping maintenance, debris removal, graffiti removal, and lighting operations. The district was originally formed by developers to provide a long-term funding source for the maintenance of public spaces in the neighborhood.

Future Assessment Fee Updates Being Explored

Although no action was taken, City staff also discussed the possibility of initiating a Proposition 218 balloting process in the future.

This would allow property owners in LMAD 3 and other underfunded areas to consider updating the assessment fee and adding an appropriate cost escalator to keep up with future expenses.

This discussion was not part of the formal agenda item concerning the Brentwood Beautification Project but was raised during Council deliberations.

Construction on the Brentwood Beautification Project is expected to move forward during the 2024–2025 fiscal year, with the goal of creating a safer, more attractive, and sustainable space for residents and visitors.

Copyright 2026 Victor Valley News Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

📢 Stay connected with the High Desert’s largest news community!

🔗 For more local news, visit VVNG.com.

Watch Now

Victor Valley News Group

Have a news tip or story idea? Email News@vvng.com Victor Valley News Group - VVNG - provides breaking news and more for communities located within San Bernardino County, with a focus on the Victor Valley region of Southern California. Follow us on Social Media.
Back to top button
Home
Local News
Contact Us